Just keep shaking your head, no one cares. Let’s take a look at just the last 2 weeks of footpath history without being touched. 2 power cuts and 3 holes dug in to the paths on Station Lane.
The path repair team managed water cut off and on over 2 days as WMDC workmen excavated a water main stop tap with a JCB and not a spade. WMDC still refuse to talk to residents and shopkeepers as works are still in progress. As ever not a Cllr in sight.