Featherstone Make a Difference Forum
October 14, 2024, 12:43:34 pm
Welcome, Guest. Please login or register.

Login with username, password and session length
News:
 
  Home Help Search Gallery Staff List Login Register  

Featherstone Regeneration

Pages: « 1 2 3   Go Down
  Print  
Author Topic: Featherstone Regeneration  (Read 6885 times)
yetion1
Administrator
Full Member
*
Posts: 1729


READY


« Reply #40 on: January 22, 2017, 04:18:21 pm »

Just keep shaking your head, it’s all you can do living in Labour Featherstone. Here is an unusual one. At 7.45pm on Friday night a road sweeper and trailer arrived at the corner of Fulton’s and Betfred. For the next hour the most unusual road repair began. Around both corners the tarmac was cut at about 2ft from the curb. A scrape was then made of the surface. Then tarmac was shovelled on to the un-compacted surface and then was finally rolled by using the wheels of the road sweeper and not a road roller. The finished job is an uneven surface lower than the original and has not been sealed at the joint with tar. The surface is all ready breaking up as it sticks to vehicle tyres. The big dint in the path caused by the JCB renovating the path is still there for all to fall in.
The road was better before?


Report Spam   Report to moderator   Logged


Pages: « 1 2 3   Go Up
  Print  
 
Jump to:  

Bookmark this site! | Upgrade This Forum
SMF For Free - Create your own Forum

Powered by SMF | SMF © 2016, Simple Machines
Privacy Policy