If WMDC really think that no one is noticing the continued lack of interest and skill being used to refurbish our high street paths here are a couple of picture for the record when everything sinks.
What a complete bodge. I guess outside Onestop the hole was so big that workmen have back filled it with rubbish and not compacted hard-core. So after digging a hole that was water logged the repair is to infill with spoil without compacting followed by sharp sand with out compacting and laying the same old bricks on top. Everyone else knows you need concrete under block paving especially as our footpaths are a car park.
I assume this manhole will sink as it has had it foundations removed for a skim of post fix.
And still every day our Cllrs drive past and say
NOTHING? 
Just a point, shouldn't the bus stop curb have a raised disabled speck?