Please shoot me down if my picture of events is incorrect.
In November 2012 the poor quality re-surfacing of Station Lane and drains filled with tarmac by the same contractors led to WMDC condemning the new surface. Under guarantee for 2 years the surface would be re-laid in February 2013.
It is now the end of May. Have you spotted the repairs yet? Yes repairs not re-surfacing.
It appears that the re-surfacing has been done. Over the last few days 4 separate small areas have been coated again on the top of the old surface without scraping the existing surface. The result is obviously a raised level. The top of the lane looks like someone steered to the path whilst distracted and only stopped when they hit the curb. Road lines have also been covered.
Given the times of the re-surfacing and the small areas you could be forgiven for thinking that someone has been on a job else where and had some tarmac left to patch up Fev.
If you could think up how to make Station Lane look worse than it is this is a good job.
Whats worrying is WMDC stated the road was under guarantee. Surly it should be like for like? Has there been a payout or deal struck.