« Reply #40 on: May 03, 2018, 07:51:20 pm »

Thursday 3rd May. Another unusual day. The truck with single male again sits for a 12 hour shift blocking the path on double yellows at the entrance to a school. It has been suggested he is the H&S man?
And then action, mid morning with more barriers going up and more traffic lights further up the street outside the vape shop. The over sized JCB arrives. The 7.5t tipper arrives. All set up and ready to go. The polite workmen again ask if WMDC has contacted anyone and again the reply was no. The workmen had been told now to leave the Yorkshire stone and lift any parts straight. Then the sun came out and the workmen enjoyed the sun sat on a step until dinner time. With lunch over it appeared that someone else had been trying to fill pot holes locally and had some tarmac left. This ended up in the existing hole outside the dentist which is supposed to be block paving? With no work started on the newly set up area the equipment was then packed up.
End of week 2 on Friday and it has to have cost over £20k so far. You could fix every pot hole in Featherstone for less than that? Roll Eyes
Report Spam   Report to moderator   Logged


Pages: « 1 2 3   Go Up
  Print  
 
Jump to:  

Bookmark this site! | Upgrade This Forum
SMF For Free - Create your own Forum

Powered by SMF | SMF © 2016, Simple Machines
Privacy Policy