Featherstone Make a Difference Forum
March 28, 2024, 11:08:27 am
Welcome, Guest. Please login or register.

Login with username, password and session length
News:
 
  Home Help Search Gallery Staff List Login Register  

Verner Street

Pages: « 1 2 3   Go Down
  Print  
Author Topic: Verner Street  (Read 4510 times)
0 Members and 1 Guest are viewing this topic.
Doberman1979
Full Member
***
Posts: 17


« Reply #40 on: June 01, 2012, 01:05:50 pm »

Cheers for that Forkhandles. Its maybe me with unrealistic expectations. I am in a position where I cant even think about selling my house and am quite frankly fed up. Between them, WMDC and WDH have systematically destroyed the location, Girnhill’s a royal dump and has been for literally years due to the way the demolition has been handled. I cite the recent back peddling of the road closure and the current issues with the 3 remaining residents CPO’s before any one challenges this!  WDH seem incapable of keeping to their published 31 day average time scale to re-let on Verner, couple that with an email I have from WMDC in Jan 2011 that states they are looking into various options and treating Verner as a separate “Phase 2” redevelopment was an option they had not discounted, led me to draw the only conclusion I could, there was more to it than sheer incompetence. I have always worked in the private sector and am used to working to a lot tighter timescales, I have never know a professional, private sector business work as slow or be as inefficient as these two are.
Report Spam   Report to moderator   Logged


Pages: « 1 2 3   Go Up
  Print  
 
Jump to:  

Bookmark this site! | Upgrade This Forum
SMF For Free - Create your own Forum

Powered by SMF | SMF © 2016, Simple Machines
Privacy Policy